ADA compliance in multi-family construction involves three overlapping sets of rules. The ADA covers areas open to the public, such as a leasing office. The Fair Housing Act sets design and construction requirements for the apartments themselves. Section 504 adds accessible units on federally assisted projects. Massachusetts and local codes can add more, so plan […]
Subdividing a lot in Massachusetts means dividing one parcel into two or more lots that each meet local zoning for size, frontage and use. Most small projects follow one of two paths under the Subdivision Control Law: an Approval Not Required plan when every lot fronts an adequate existing way, or a definitive subdivision plan […]
Multifamily property management planning should begin roughly 12 to 18 months before substantial completion, not after. Developers who select a management company, stand up property management software, build the lease-up calendar, and document maintenance systems during construction avoid the handover scramble that stalls rent collection and delays stabilized occupancy. For most developers, the construction phase […]
Sustainable multifamily construction in Massachusetts means building to one of three energy codes: the Base Code, the opt-in Stretch Code, or the Specialized Opt-In Code, depending on which tier your municipality adopted. Beyond energy performance, projects must address solar-ready roof zones, EV-ready parking spaces, water conservation, and material selection. Developers planning a multi-family project in […]
Noise separation in multi family construction relies on Sound Transmission Class (STC) ratings for walls, Impact Insulation Class (IIC) ratings for floor-ceiling assemblies, and disciplined control of flanking paths through MEP penetrations. Massachusetts building code 780 CMR requires a minimum STC 50 for walls and floors separating dwelling units in multi-family buildings. Tenant complaints about […]
Building a duplex or triplex in Massachusetts as an owner-occupant or small investor typically runs $180 to $270 per square foot for construction, takes 12 to 18 months from concept to certificate of occupancy, and is newly supported by MBTA Communities Act rezoning in 177 municipalities plus a pending statewide duplex-by-right bill. Owner-occupants can finance […]